Country: | PAK |
Type: | M |
Route: | 13 |
Maint: | National Highway Authority |
Length Km: | 117 |
History: | Under Construction |
Direction A: | East |
Direction B: | West |
Terminus A: | Kharian |
Terminus B: | Rawalpindi |
Cities: | |
Alternate Name: | Kharian-Rawalpindi Motorway |
The M-13 motorway (Urdu: {{Nastaliq|موٹروے 13 ), or the Kharian-Rawalpindi motorway, is a motorway in Pakistan, under construction since September 2022.[1] M-13 will connect Rawalpindi to Kharian. The 117km (73miles) long motorway will have 8 interchanges, 2 service areas, 26 bridges, including one spanning River Jhelum, and two twin-tube tunnels of 1.3km (00.8miles) and 0.6km (00.4miles) respectively to cross the Salt Range between Dina and Sohawa.[2] The M-13 will be a six-lane motorway with a design speed of 120kph and an expected completion time of 2 years.[3] The motorway will reduce the travel time between the capital cities of Islamabad and Lahore by one hour compared to the existing M2 Motorway, while also taking traffic off of the congested N5 Highway that runs parallel to it. It is link to M2 Motorway via Rawalpindi Ring Road.