Hongasandra | |
Other Name: | Garvebhavi Palya |
Style: | Namma Metro |
Address: | Hongasandra, Bengaluru, Karnataka 560068 |
Coordinates: | 12.9017°N 77.6321°W |
Structure: | Elevated, Double track |
Platform: | Side platform Platform-1 → / Rashtreeya Vidyalaya Road Platform-2 → Bommasandra |
Levels: | (TBC) |
Tracks: | 2 |
Parking: | (TBC) |
Opening: | (TBC) |
Electrified: | 750 V DC third rail |
Accessible: | (TBC) |
Status: | Final Stages before Operations |
Code: | (TBC) |
Owned: | Bangalore Metro Rail Corporation Ltd (BMRCL) |
Operator: | Namma Metro |
Map State: | collapsed |
Mapframe: | yes |
Mapframe-Marker: | rail |
Mapframe-Zoom: | 14 |
Hongasandra (also known as Garvebhavi Palya) is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India.
As per latest reports, the Yellow Line is stated to be operational around December 2024 due to the upcoming Indian general election which will occur during April–May 2024 and lots of trial runs along with more trainsets are required for commencement of operations. [1] [2] [3] [4] [5]
Station Layout (TBC)
G | Street level | Exit/Entrance | |||
valign=top | L1 | valign=top | Mezzanine | valign=top | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left | |||
Platform 2 Southbound | Towards → Bommasandra Next Station: Kudlu Gate | ||||
Platform 1 Northbound | Towards ← / Rashtreeya Vidyalaya Road Next Station: Bommanahalli | ||||
Side platform | Doors will open on the left | ||||
L2 | |||||